Isolation log week 63
Isolation log week 63
Work done from home and in the office 2021-05-31 to 2021-06-04
Total: 38.50 hours
G&T: + 3.5 hours
Monday 2021-05-31
0.25 hours: Update Jenkins servers.
0.25 hours: Keats: Add Redbourne into Tour Map.
2.50 hours: DVPP: Refreshed TEI throughout many of the periodicals, and fixed a couple of oddities; project meeting with AC; fielding timesheets; published today's build of the site to the live location.
1.00 hours: LEMDO: Building ODD; debugging TEH's ODD build problems; a couple of discussions.
0.50 hours: Maint: Debugging an issue with an SVN repo, and investigating obsolete repos ripe for deletion with GN and LW.
0.25 hours: Scancan: Discussion re formatting of runes per style guide.
4.00 hours: Keats: Much more progress with the SVG diagram, including some suggested style changes from KB; work on JS to integrate with the diagram, and change to the build process to incorporate mentioned people to make simple popup options work.
Total: 8.75 hours
Tuesday 2021-06-01
0.25 hours: Update Jenkins servers.
0.25 hours: LEMDO: Debugging build break.
1.50 hours: HCMC Project Meeting.
2.25 hours: Scancan: Author's proofing corrections for article, and figuring out a serious font rendering issue relating to runic transcriptions. I think we have a solution using a specific font, but waiting for the OK to implement it.
2.00 hours: Endings: Work on drafting of some linking sections for the DHQ article; converted some drafts to markdown.
1.00 hours: Keats: More progress with the diagram, style tweaks, and discussions with KB.
0.50 hours: Wendat: Project meeting.
Total: 7.75 hours
Wednesday 2021-06-02
0.25 hours: Update Jenkins servers.
2.75 hours: Keats: Discovered, debugged and worked around an SVG problem in Safari on Mac; finished the last few components of the diagram; reworked the layout a little to condense it; added links to newly-added bios; added highlighting functionality based on the key.
1.00 hours: MoEML: Project meeting, discussion of text-analysis output ticket, preparation for geo-a-thon on Friday.
2.75 hours: Endings: Wrote a couple of new short sections for the article; edited and converted existing bits to markdown; discussed remaining bits with JT.
0.75 hours: Scancan: Made final tweaks to review and published the site afresh. Long email on 2022 migration to UAlberta hosting.
Total: 7.50 hours
Thursday 2021-06-03
0.25 hours: Update Jenkins servers.
0.25 hours: More DVPP timesheets.
1.75 hours: Scancan: Wrestling with fonts for runic transliterations. The suggested font is not Unicode and would be impractical, and even that font does not contain all the required characters. Got most of the way there with Aboriginal Sans, but still one mathematical symbol is causing problems. Huge time-sink for obscure once-in-a-decade requirement.
0.50 hours: DVPP: Rebuild stats; some work on generating canonical citation in dialog with AC, currently waiting on instructions for handling edge case person records.
2.00 hours: Endings: Draft of another short section of the paper, with associated reading/research.
0.25 hours: BreezeMap: Add source map generation for SCSS build.
2.25 hours: Keats: Debugged and fixed a problem with menu highlighting in map pages; rewrote the map preprocessing so that it doesn't cause svn conflicts by modifying tracked files; fixed favicon linking, which was absolute rather than relative; laid out options for diagram page layout to KB; incorporated CSS source map from BreezeMap, so there are now no attempts to retrieve anything that fail.
Total: 7.25 hours
Friday 2021-06-04
0.25 hours: Update Jenkins servers.
1.00 hours: TEI: With SB, completed work on a ticket on the tag element, and further discussed XSLT course.
3.25 hours: MoEML: Preparing for workshop on geo-encoding; rewriting documentation for it; leading workshop; further updates to documentation; adding several locations.
2.00 hours: Keats: Updates per KB to diagram layout; XSLT to enable rapid transformations of the diagram; fairly radical experimental changes to the layout of non-timeline pages, implemented initially to enable optimal display of the diagram, but probably generally beneficial.
0.25 hours: Moses: Helping SK with some diagnostics XSLT.
0.50 hours: MoEML: Diagnosed a build-break. Cleaned up old Schematron for locations, and added a couple of enhancements.
Total: 7.25 hours