Isolation log week 62
Isolation log week 62
Work done from home and in the office 2021-05-25 to 2021-05-28 (4-day week)
Total: 30.00 hours
G&T hours: +2.00
Tuesday 2021-05-25
0.25 hours: Update Jenkins servers.
0.25 hours: MoEML: Add ids to pbs in all but one of Stow 1633 chapters (one has an anomaly yet to be fixed).
0.50 hours: Keats/BreezeMap: Make shape interior opacity configurable in BreezeMap, and configure it in Keats Tour map to be fully transparent.
1.50 hours: HCMC Staff meeting.
0.25 hours: Scancan: Entered author's proofing edits for latest review; published the site to make it available.
2.00 hours: BreezeMap: Implemented and closed two feature requests, one for a method to hide items from the menu, and one which makes the provision of arrowheads on LineString segments more sensitive to segment length, so they don't bunch up into a big mess.
1.00 hours: DVPP: Prepared a brief document to get our discussion started on what end-user poem pages should look like, and gathered some sample sites for ideas.
1.50 hours: Keats: Various fixes and updates to the map to take advantage of the BreezeMap updates. This is now getting close to what I want it to be, although it will need at least some information about each of the actual places.
Total: 7.25 hours
Wednesday 2021-05-26
0.25 hours: Update Jenkins servers.
0.25 hours: MoEML: Per KB add signature links to Stow 1633.
1.00 hours: Endings: Drafted another couple of sections for DHQ paper.
1.75 hours: LEMDO: Regenerated schema; Project meeting, prep and follow-up; GitHub repo permissions fixes; Schematron rule extension to catch issue in egXMLs.
0.50 hours: HCMCIcons: Discussions with GN re use-cases and possible build process.
0.25 hours: Pro-D: Discussions with GN re XSLT for MoM project.
3.00 hours: DVPP: Comments/discussions on document ahead of meeting; regenerated TEI metadata for several periodicals; project meeting on poem rendering; picked off a couple of to-do list items, including querying exif metadata to find images which were "rotated" only in exif, and fix them; backed up image collection to Squash.
0.25 hours: Keats: Email to KB re remaining work on tour map.
Total: 7.25 hours
Thursday 2021-05-27
0.25 hours: Update Jenkins servers.
2.25 hours: LEMDO: Fix Schematron rule undermined by New Thing (prod: prefix); diagnose another build break and report to team on another New Thing. Added fixes for changes resulting from new prod: prefix; added fixes to the PDF build to account for the same changes, as well as the decision to remove all front elements from born-digital docs.
2.00 hours: TEI Stylesheets working group meeting -- prepared report on issue #496 in advance.
1.25 hours: Hul'q'umi'num' teaching site: had requests for proposal to update the site to remove Flash-based audio; prepared a detailed project plan/estimate of time with two options.
1.50 hours: Despatches: Prep for meeting, meeting with JL, GL and KS, and follow up, planning the end of the project and launch.
Total: 7.25 hours
Friday 2021-05-28
0.25 hours: Update Jenkins servers.
0.25 hours: Endings: Discussion with JC about file organization in static site recommendations.
1.00 hours: TEI: Work with SB on Stylesheets issue #496, which we eventually close as unfixable.
2.00 hours: Keats: Implemented placeography file and populated it with all places gathered so far; updated schema to support it; created sample entry for one place; wrote processing to harvest entries from that file into the map-source TEI, tested and bugfixed. Tour map is now drawing its description info from that source. Excluded placeography from search results until it's more populated.
0.50 hours: Ling: Created and populated svn repo for Hulq teaching site, set up user permissions, and added it to backup scripts.
0.50 hours: Windows updates (as usual, fraught) and Oxygen update on Windows VM.
1.25 hours: Endings: Finished drafting Products section, and worked on updating and formatting bibliography items mentioned so far.
1.00 hours: DVPP: Refreshed TEI for several periodicals; found an oddity caused by errors in image file naming and location, clarified with SP, and did fixes; addressed remaining two poems lacking dominant rhyme setting with K & K.
1.50 hours: Keats: Working on the relationship diagram, figuring out best matrix and layout options, and placing the first few people. Figured out some discrepancies between browser rendering of baselines and worked around them. Some questions to KB on the meanings of colours.
Total: 8.25 hours