Log in

HCMC Journal

Wendat 2026-04-13 to 2026-04-17

to : Martin Holmes
Minutes: 205

On Monday, met with ML and worked through a number of bugs in preparation for a release. Then spent a fair amount of time getting the build process to successfully suppress one specific document which we don’t want to build, as well as suppressing links to it. This was tricky because we still really have two distinct builds, one for the MSS and one for the Dictionary, and they run independently.

On Friday, wrote and tested a new diagnostic requested by ML, which checks that hyphs in the narrative texts match those in the examples or entries they point to.