Gathered everything written so far by both of us and put it together into one document. Created tasks in the blog for the remaining steps that need to be done. The whole thing needs to be off our plate by the end of January.
January 15, 2007
Do a final proofing of the chapter and send it off to Ana.
Put the chapter into OpenOffice (to be saved in Word format, as required -- grrrr), then add all formatting according to instructions on the ReCALL Journal site.
Basically completed 24/01/07: Write the conclusion to the chapter (part 7, the "what ifs").
Finish a first draft of everything except part 7 (yet to be written).
COMPLETED 22/01/07: Each of us should read through the chapter (parts 1 to 6) and highlight all the bits that are incomplete, missing or only in note form.
January 12, 2007
Gather all parts of the HotPot chapter written so far, and create tasks for what remains to be done.
Completed on January 15.
December 21, 2006
Wrote couple of hundred words on Future plans: SCORM compliance and unicode in interface. Next is change in data files to IMS XML and ability to do sequencing in Hot Pot 7.
Wrote most of the draft of part 6 of the chapter, turning up some interesting references on the lifecycle of academic software vs industry software.
Minor changes to chapter 2
Completed last section of chapter 3 and rearranged a few bits
Started on chapter 5
Dicussed with Martin alternate structures for content once we've got it all: strictly chronological or technical thread then business thread.