Project plan, Endings-style
Posted by mholmes on 08 May 2017 in Activity log
PROJECT PLANS, MAY 2017
Preliminary stuff Trish does first:
- creating all the multiple-size versions now allowed following agreement from Danish National Library.
Stage 1: Specification for the new site menu and image array:
- Main menu must work on all devices.
- Thumbnail array should use grid layout and be flexible for all devices.
Display all images in grid layout.
Each image has a descriptive caption (currently @title).
When an image is clicked on, the grid disappears, and is replaced by a button for "Show thumbnails".
The record appears.
When you click on "Show thumbnails", all the images appear again above the current record.
Stage 2: Move data into svn (XML, not images).
Stage 3: Redesign pages in HTML5.
Stage 4: Write build process to create pages.
Stage 5: Implement Jenkins build.
Stage 6: Implement XAR creation in build process.
Stage 7: Roll out new eXist and test.
Stage 8: Replace original app.