Posting hours worked while working from home 2020-02-03 and following
2020-02-03:
Monday:
1 hour admin making sure student timesheets go to people who can sign them, informing HCMC staff about the situation, and rescheduling a workstudy from GRS.
1 hour setting up a new GitHub repo for the facsimile viewer code, separate from the DVPP repo where it started life, and then configuring it as an external for DVPP. Tested and working.
0.5 hours debugging Moses PDF build problem for SK (Moses).
0.25 hours renaming facsimile files for CH (LEMDO).
0.5 hours creating HCMC facsimile viewer.
Total 3.25 hours. Will debit 3.75 from my G&T.
Tuesday:
0.25 hours updating virtual servers.
0.5 hours regenerating stats for DVPP, building new TEI files for Macmillan 1860, and running OCR on those files.
0.25 hours relocating hcmcFacsViewer code in svn repo, and adding MoEML content to it.
0.5 hours debugging and fixing a problem with the DVPP build.
1 hour debugging and fixing an HTML validity problem in ColDesp.
0.75 hours working on rendering of born-digital site pages in ColDesp.
1.5 hours JTEI Issue 12 Editors' meeting (with Janelle and Kathryn Tomasek).
0.5 hours accessing mango through work machine to get sql dumps; running TEI generation and OCR on DVPP Macmillans 1870 and 1880.
Total 5.25 hours. Will debit 1.75 from my G&T.
Wednesday:
No chance to do anything. Will debit 7 hours from my G&T hours.
Thursday:
In the office from 7.35.
1 hour preparing for English 481.
1.5 hours teaching English 481.
0.5 hours working on Wendat documentation and Oxygen setup.
1 hour catching up with email.
0.5 hours ColDesp meeting/discussion with GL and KSS.
1 hour working on DVPP.
Total 5.5 hours. Will debit 1.5 from my G&T.
Friday:
0.5 hours updating DVPP stats, generating TEI for Hobby Horse 1890, OCRing Hobby Horse 1890, and sending email about rotated images which got lost yesterday.
0.5 hours reworking and testing the use of svn export instead of an svn:external setting for the Keats project, to solve the circular build problem on Jenkins.
0.5 hours porting that fix to DVPP, for use with facsViewer code and staticSearch code. Hopefully our circular builds are now solved.
1 hour adding support for thumbnail images to the facsViewer codebase; this is required for the Despatches static site.
1.5 hours starting work on implementing Despatches static image brower: mostly fixing existing build problems.
Total 4 hours. Will debit 3 from my G&T.