MDH: 22.5 + 2 = 24.5 hours G&T Posted by mholmes on 02 Feb 2009 in G&T Hours Busy with long backup job, and then copying the backup file over to the Linux box, as well as doing scanning job which turned out to be quite large (still not finished). This entry was posted by Martin and filed under G&T Hours.