Lots of work, lots of progress
Posted by mholmes on 17 Apr 2019 in Activity log
Today's meeting was productive, and following it I implemented a process for reporting on the main rhyme-scheme of a poem and variant stanzas that don't follow it. This threw up a couple of issues which I fixed with Schematron and cleanup. I've also re-worked the way the page-image pops up when you mouse over it, and parameterized the URLs used in building poems so that on Jenkins we should (if all goes well) get proper relative links to other site pages, whereas on the local build for encoders, you get fixed links to the Jenkins build. 360 minutes.