HCMC Blogs

  • « MDH: 519.50 + 1.25 = 520.75 hours G&T
  • MDH: 518.25 + 1.25 = 519.50 hours G&T »

Isolation log week 35

Posted by mholmes on 09 Nov 2020 in Uncategorized

Isolation log week 35:

Work done from home and in the office 2020-11-09 to 2020-11-13 (4-day week, Wed is holiday)

Total hours: 29.25

G&T hours: +1.25

Monday 2020-11-09

0.25 hours: Update Jenkins servers.
2.25 hours: LEMDO: implementing new menus for lemdo-dev; project meeting with interface designers; discussion with JJ.
1.50 hours: Endings/staticSearch/Mariage: more steps and tests on French stemmers, including a refactoring to reduce calculations.
2.00 hours: Scancan: Preprocess next vol 28 article; set up XML file; encode first half of bibliography.

Total: 6.00 hours

Tuesday 2020-11-10

0.25 hours: Update Jenkins servers.
0.25 hours: Endings/staticSearch/Mariage: fix error in step1f of stemmer with help from OB and MP.
0.50 hours: Scancan: Finish encoding bibliography for latest vol 28 article, along with introduction.
1.50 hours: HCMC Staff meeting.
2.00 hours: LEMDO: Project meeting, getting familiar with Teams, raising, completing and closing simple tickets.
0.50 hours: MoEML: Fix for spacing issue with blockquotes; proved more complicated than it should have been.
2.00 hours: LEMDO: Fixing, testing and re-fixing script for PS so that it actually does work on Macs. Discussion with JJ about the mass of media files on iseadmin, and what we should do with them; Debugging and fixes for broken http links to images on ise site.
1.00 hours: Endings/staticSearch/Mariage: implemented steps 1g and 1h in stemmers, with tests.

Total: 8.00 hours

Thursday 2020-11-12

0.25 hours: Update Jenkins servers.
0.25 hours: LEMDO: Add new doc taxonomy category for lemdo-dev anthology; rebuild schema.
0.50 hours: Maint: Discussion with GN about site-level stats and requirements; testing of current analytics.
0.25 hours: GRS/Greek: Check and fix typos in Greek exercise per MN.
1.50 hours: TEI: Infrastructure Group meeting.
2.00 hours: Wendat: Prep for meeting this afternoon; orking on keystroke shortcut issues on Mac w/French Canadian keyboard; implementation of dynamic keypad for search page on site.
2.00 hours: Scancan: Finished encoding the next article for vol 28 and posted it for proofing.
1.50 hours: Wendat: Project meeting.

Total: 8.25 hours

Friday 2020-11-13

0.25 hours: Update Jenkins servers.
0.25 hours: Maint: test server/db sites and report problem with cluster migration.
1.50 hours: TEI: Meeting with SB to work on altIdent/FPI ticket.
1.00 hours: LEMDO: Refactor anthology diagnostics, and build diagnostics for all anthologies into main build process.
1.00 hours: Endings/staticSearch/Mariage: Implement another stage in the French stemmer, with tests.
2.50 hours: LEMDO: Debug and work around a build-breaking validation problem caused by the hierarchy rewrite during the generation of Original XML; debugging of a subsequent problem involving figures inside stage directions, discussion and fix.
1.00 hours: Endings/staticSearch: Preliminary work on calculating and storing fragment ids for KWIC strings so that we can provide links to specific locations in the document (issue #88).
0.50 hours: Move of Hot Potatoes User group from Yahoo to Google Groups.

Total: 7 hours

This entry was posted by Martin and filed under Uncategorized.

HCMC Blogs

Search

User log in

  • Home
  • Recently

All blogs

  • Academic
  • AdaptiveDB
  • Admin
  • Announcements
  • CanMys
  • Cascade
  • CGWP
  • ColDesp
  • Depts
  • DVPP
  • Endings
  • HCMC Blogs
  • Landscapes
  • LEMDO
  • Linguistics
  • Maint
  • LondonMap
  • Mariage
  • MoM
  • Moses
  • Pro-D
  • Projects
  • ScanCan
  • HumsSites
  • Wendat

XML Feeds

  • RSS 2.0: Posts
  • Atom: Posts

This collection ©2026 by admin • Help • RWD CMS