Isolation log week 12
Isolation log week 12:
Work done from home 2020-006-01 to 2020-06-05.
Week 12 total hours: 37.75
G & T hours: 2.75
Monday 2020-06-01
0.25 hours: Update Jenkins servers.
0.50 hours: LEMDO: Tweak punctuation handling for quoted glosses; request decisions on rendering for stage directions embedded in prose speeches.
1.50 hours: Moses: Working on preprocessor that removes persNames and references to/from them.
1.00 hours: MoEML: Project meeting.
0.25 hours: DVPP: Timesheet gathering and submission.
0.25 hours: MoEML: Fix for broken build due to minor error in LS's learning-by-doing Schematron and XSLT changes.
1.00 hours: DVPP: Some ad-hoc diagnostics focusing on specific rhyme and sonic device encoding issues; discussion of same; fixes and summary.
1.00 hours: AdaptiveDB: Diagnose and fix problems resulting from upgrade to new MySQL on Loquat; test fixes.
1.00 hours: DVPP: Debugging problem with drop-cap CSS (not figured out yet); discussions on notated music.
0.75 hours: Moses: discussions about sort order in Eng-Nx glossary, and implementing/testing decisions; more discussions on purging of persName entries, refs and links.
Total: 7.50 hours
Tuesday 2020-06-02
0.25 hours: Update Jenkins servers.
1.75 hours: TEI: Stylesheets ticket triaging/labelling with SB, PS and EBB.
1.75 hours: HCMC Zoom staff meeting.
1.00 hours: Moses: Fix bug in persName-stripping code, and move on to the next challenge.
0.50 hours: MoEML: Discussion of square brackets in quotes, and implementation of decision to abandon diagnostic that's doing nothing useful.
0.25 hours: Housekeeping: backups, emails, etc.
2.00 hours: Moses: Finish pre-processing step that removes persNames and associated information, reformatting prose around missing bits. Rewrite build code to remove work now done in preprocessing. Add more info/diagnostic output to build process. Discussion with SK around how all this works and what it reveals.
Total: 7.50 hours
Wednesday 2020-06-03
0.25 hours: Update Jenkins servers.
0.75 hours: Project Endings: Prep / drafting premeditated tweets for Saturday's presentation. Follow-up emails with JT.
1.25 hours: ColDesp: Changes to search engine filters suggested by GL; debugging issue with diagnostics.
2.00 hours: Scancan: Create SVG cover component templates, and write instructions for creating a fresh cover. Rework vol 27 cover to test out instructions.
0.50 hours: DVPP: Figure out encoding approach to handle drop-cap combined with hanging indent, and report to the team.
1.00 hours: MyNDIR: Change rendering of biblio entries; debug and fix an issue with sequencing of biblio entries and rendering of repeated author with 3-em dash.
1.25 hours: MoEML: Training session for LS, introducing Ant and reviewing last week's work.
0.50 hours: LOI: Investigating Japanese tokenizers (Sudachi, mecab, and others) to prepare for meeting with JT on Friday.
0.75 hours: LEMDO: PDF build: fixed bug which reversed numbers in localCit pointers, made foreign elements italic, suppressed the lexical notes, and rebuilt and uploaded the three PDFs.
0.50 hours: Moses: Email check-in with SK about remaining tasks to be completed and status of current work.
Total: 8.75 hours
Thursday 2020-06-04
0.25 hours: Update Jenkins servers.
1.50 hours: DVPP/Maint: Migration of DBs to new MySQL host: updates to PHP, testing, backups, rewriting of ant management code.
1.00 hours: Moses: Adding missing subscript 1 and 2 characters to four fonts required for the PDF generation.
1.50 hours: LEMDO: Project meetings.
2.75 hours: Wendat: Harvesting, tagging and rendering 189 reconstructed form tables from ML's dissertation; project meeting.
Total: 7.00 hours
Friday 2020-06-05
0.25 hours: Update Jenkins servers.
1.00 hours: TEI: With SB, work on Stylesheets issue 201.
0.75 hours: LEMDO: Checking current PDFs, raising issue of bibl references, fixing quote formatting issue.
1.50 hours: Wendat: Encoded another set of reconstructed forms; now up to 345 out of 570.
1.50 hours: Moses: New content model for def element, and fixes to errors found by it; tried and backed out of new content model for seg, but fixed many errors it found; waiting for ECZH and SK to answer queries on other issues arising.
2.00 hours: Endings/staticSearch: Switching attribute and class name; planning and laying out the methods for pluggable tokenizing and stemming; Updates/fixes for tomorrow's presentation; discussion of wildcard search plan and requirements; cross-merging of various branches of the repo.
Total: 7.00 hours