EG-W and the rest of us spent a while discussing the HW and SW list for the future labs, as well as room layouts, network issues, and so on.
Category: "Activity log"
Further scheduling of lab demos:
Sept. 10/07: 6 demos - Japanese 149, 150 lab sessions
September 7/07: Attended Administrative meeting regarding daily operational tasks and assorted upcoming administrative items.
Action items designated, correspondence underway.
Next meeting set for Tuesday, Sept. 11/07.
Scheduling labs for additional Linguistics lab request.
(Ling 261 - Sept. 27, Oct. 1/07 booking)
Sept. 7/07: Above request now cancelled - "temporary" lab
booking not convenient with students' timetables.
Administrative and operational tasks processed.
Conducted lab demos for Chinese 149, F01,F02,F03 classes.
SCHEDULED LAB DEMOS FOR UPCOMING JAPANESE, CHINESE, AND SOUTH EAST ASIAN LABS.
Went to today's meeting, and learned about the new web.uvic.ca system and its load balancer, along with plans for Exchange Server, uSource, Urchin stats and other stuff.
Went to the monthly meeting to learn more about the Events Calendar API and the plans for LCMS and web.uvic.ca.
Attended the training session for the UVic Events Calendar (events.uvic.ca). Arranged to have our calendar set up, with me as admin, and then added Stew and Greg as admins too; we should also add Elizabeth and Judy when we've run through the system with them. Our calendar is here. It doesn't have any events in it yet, nor has it been customized with a heading/banner, but it works. This afternoon I'm going to the WebDev meeting at which we'll learn about accessing the RSS feeds from the calendars, and other API features.
Spent much of the morning getting back up to speed after the vacation. Went through all my email and checked that no tasks had got lost in the shuffle; had a brief meeting with Mike Best and Andre regarding the need to upgrade the SVN client on Mustard, and after checking with Greg, submitted a request to sysadmin; had some email back-and-forth about the Colonial Correspondence project; documented my vacation days; started getting up to speed on the Icohtec site, which I'll probably have to take over again while Greg's away; etc. etc.
JN: Processed Administrative tasks/paperwork required for Purchasing Dept.
JN:June 20, 2007
HCMC records: Sorted, refiled, stored out-of-date files, and re-arranged administrative current records.
JN: Received, processed, documented Neuropsychology routine
audio work order.
JN: Administrative
Lab B&C Scheduling Sept. 2007-April 2008
Lab B&C lab schedules updated with Humanities requested additional lab times.
Records updated, copies made, accompanying memo composed and attached.
Delivered in person on June 18, 2007:
Updated lab schedules to Continuing Studies; C/Studies Coordinators will book September 2007 - April 2008 lab bookings as usual and return schedules to HCMC.
Schedules return deadline: June 25, 2007
Discussion of the future of the labs, software needs, outreach for Shawnigan Lake, and other stuff.
Discussion of the future of the labs, software needs, outreach for Shawnigan Lake, and other stuff.
JN: Preparation of HCMC administrative paperwork in readiness for signature.
JN: Removed, sorted, packed, listed 8 boxes of ESL materials from the Archive Room in readiness to send over to ESL Dept.
Currently preparing list of audio, video items for ESL perusal.
When current list is defined remainder of audio, video materials will be sent for storage in ESL Dept., Continuing Studies Bldg.
JN: Scheduling of additional Humanities Lab Requests (September 2007 - April 2008):
Received additional lab usage requests from Pacific and Asian Studies Dept. Updated lab schedules in preparation for sending to Continuing Studies so they can book their September 2007-April 2008 lab requirements.
JN: delivered to German/Slavic Studies Dept.
6 boxes of materials from Archive Room.
Updated records
ARCHIVE PROJECT:
JN: REMOVED AND SORTED, PACKED, DOCUMENTED ADDITIONAL GERMAN, RUSSIAN, SERBO-CROATIAN MATERIALS (BOX #107, 108)
UPDATED RECORDS
Robert Aucoin of Avant Learning and formerly of Open School British Columbia contacted me for details on Hot Potatoes and its compatibility with SCORM, LMS's and the degree to which its data files and web pages were standards compliant, and the terms of use of the various components of the software. Met for lunch meeting on these topics.
Also talked about general issues of simplicity of technology in e-learning and distance education for jurisdictions with dramatically inconsistent internet infrastructure, and the pros and cons of using one-product-for-all-your-needs management systems (e.g. Moodle, Desire2Learn) rather than a collection of simpler technologies, espcially for small organizations.
Work study proposals now signed, completed, copied; delivered in person by Judy to Student Awards and Financial Aid Dept. (UVic Centre) on June 1st, 9:30am.
Results expected in July.
Stew and I got the workstudy process started for this year: logged on to http://campus.workopolis.com/, tweaked last year's job descriptions a little, and saved them as drafts, then printed them out, along with the form for the dept head to complete, which prioritizes them. We added supervisor's contracts signed by us, and left the package with Judy to pass to Peter. It would be good if we could get this done before Peter goes.
Adding this as a task for June 15, to follow up and make sure it's done.
Warning note on http://campus.workopolis.com/ -- the site seems to require Internet Explorer on Windows, and even on IE7 you get JavaScript errors. Shame.
Preparation of administrative paperwork related to HCMC operations and accounting.
Martin started on GUI in Java, helped him with classes and methods for layout components, various kinds of text fields etc. On and off for the afternoon.
Discovered two layout managers in java 1.6 used by his netbeans that I wasn't familiar with. Overall, process seems a lot easier than I recall it with Java 1.4 in JBuilder.
Interesting and useful meeting. Spent some time discussing implications and plans with the rest of the staff afterwards.
My interests will center around :
- a lot seems to hinging on the existence of a working LCMS, which does not appear to be in place (as mentioned in the constraints). What is degree of confidence that the capabilities and delivery dates for that LCMS are such that the LCMS can be incorporated productively and its utility evaluated fairly?
- the degree to which the templates provided for departmental will work in a variety of development and maintenance frameworks (for examples: someone using Contribute versus the LCMS versus a text editor to edit content; a developer using DreamWeaver or a text editor to create pages versus using PHP or AJAX to assemble pages consistent with the recommendation)
- the degree to which the elements provided by the central web presence (content, design elements etc.) are accessible (especially programmatically) to departmental sites whether or not they use the recommended templates (for example, the ability to include course descriptions from the calendar site into departmental web sites, or the ability to integrate the presentation of departmental application requirements/recommendations with that of institutional application requirements)
Prepared questions for intereview and ran them by Karin.
Interviewed 2 candidates for contract positions with Ray, one position to start immediately, another may start later in the summer. Will be interviewing a third person next Friday when Ray and I are both in again.
Immediately after interviews discussed with Ray and Karin suitability of candidates for immediate and possible future positions.
April 18
Completed additional administrative and accounting tasks
APRIL 16, 2007:
Delivered to French Dept. Shipment #4 (7 boxes)
Updated records
Received lab schedules from ESL and Cont. Studies
for April - August 2007 lab bookings.
Additional Spanish lab requests now included on schedules;
all schedules updated; confirmation sent to Continuing Studies re additional Spanish.
Inherited a second CRT from Greg, to replace my old CRT, and spent some time setting it up.
March 21, 2007:
Delivered to French Dept. shipment #3 (10 boxes)
Listing and data-base updated.
When trying to get listing of inbox for sarneil@uvic.ca in thunderbird, got error message "pop.uvic.ca can't get lock. Mailbox in use". I tried usource, where I could get the listing, but if I tried to delete a message I got a "openFOlder() read-only lockout 2" error message. Suspect it may have something to do with PGL's email with 17 meg attachment, though Martin got it OK.
Spent half an hour with the help-desk people testing. They are escalating to sys-admins.
Subsequently, I used the webmail interface to get into the account and delete the PGL email, then got thunderbird to see the account's inbox. I later tried to get thunderbird to see the inbox again, but it failed. Test incoming mails have all arrived, so I think that much is working OK.
ADDITIONAL ADMINISTRATIVE TASKS FOR SHOWCASE MAR.16,2007
GIFT PRESENTATIONS, VOTING PREPARATIONS, ACCOUNTING DETAILS FOR ATTENDEES, EQUIPMENT ARRIVAL AND SETUP INFORMATION
ADMINISTRATIVE TASKS RE SHOWCASE
ASSISTED WITH ADMINISTRATIVE DUTIES RE: CATERING,
EQUIPMENT, ACCOMMODATION ARRANGEMENTS
ARCHIVE PROJECT:
LISTED FRENCH CONTINUING STUDIES OUTDATED EXAMS
PREPARED DOCUMENTATION FOR FORWARDING
ORGANIZED, PREPARED 6 MORE BOXES FOR SHIPMENT
ORGANIZED, SET UP ADMINISTRATIVE OFFICE FILES
TRANSFERRED OVER FILE CONTENTS, UPDATED CURRENT FILES
Delivery Mar. 8/07 to Hispanics Dept. (13 boxes)
Updated documentation and data-base.
PREPARED FRENCH SHIPMENT #2 (10 BOXES)
PREPARED HISPANICS SHIPMENT #1 (13 BOXES)
DETERMINED STATUS OF EXISTING HISPANIC MATERIALS IN ARCHIVE
UPDATED FRENCH AND HISPANIC DATA-BASES.
TOTAL ARCHIVE PROJECT BOXES PREPARED TODATE: 102
Backed up about half a dozen sql db's residing on csmgenr and csmgenr2. Both .sql and csv files for each. Backups in the SQL_backups folder on my mac.
While I was at it, updated my notes on the process in backupSQLdb.txt on my mac. I need to get some details from Clifton on the Agenda db.
Started by adding a list of project titles with links at the top of the showcase projects page and then normalizing the entries for each of the projects.
When I tried to validate that I discovered that the piece of code generating the 10 most recent blog titles was generating code that didn't validate, so with a bit of help from Martin and Greg I found the problem, looked through the php documentation to find a solution and ended up using the htmlspecialchars method on the href string returned by the call to the rss feed.
ADMINISTRATIVE MEETING WITH SCOTT
VARIOUS ITEMS, PLANNING
ARCHIVE PROJECT: FEB. 28/07
MATERIALS SORTED; DATA-BASE UPDATED;DOCUMENTATION COMPLETED
DELIVERY: Feb. 28/07
DEPT : German and Slavic Studies Dept.
BOXES : 6 boxes
With Scott and Greg, went to the IT Working Group meeting on Moodle.
Continued work on the HCMC site to make it easier to get useful printable output:
- Flagged all URLs which have content identical to their
hrefattribute asclass="IsURL". - Wrote CSS to handle those.
- Enhanced the CSS to expand relative URLs into full URLs.
- Edited PHP to wrap each project description in a
<div class="hcmcProject">tag, so that content can be more attractively indented. - Coded for that class in the CSS.
Spent some time with Scott and two researchers discussing ways to protect intellectual content and project data without undermining our documentation processes and code-sharing.
The workshop was quite good. I won't decribe it in too much detail at the moment (2 days of stuff), but I do hope to apply some of the techniques and practices I learned. I liked most the concrete steps and procedures for evaluating problems (presented as "gaps" between existing issues and desired outcomes), and the focus on consensus building in the decision making process. I also liked the concept and practical suggestions for establishing a groundwork for engagement. These are the "rules" for discussing issues, which staff and managers create together before tackling problems and making decisions.
There is ample material in my office for re-distribution if you are interested in HR's adopted approach for problem solving and decision making. The intended target is the "team" oriented workplace.
The Showcase requires a couple of pages of info on the HCMC site, and it will also need a printable flyer. We decided that all HCMC pages should have a worthwhile print output, so we started work on a print.css page, which is now available for all pages on the site, and is 70% complete. Remaining problems are:
- Links on the site must be properly rewritten so that we can distinguish between links which need URLs in brackets, and those that don't. That's going to be good practice anyway. We should use classes.
- Top-of-page links need to be suppressed.
- Page-breaks need to be allowed in (e.g.) bulleted lists.
- Indents need to be adjusted in headings/subheadings/subsubheadings.
- Borders and bg colours need to be removed from link lists.