Category: "Activity log"
Met with JN for 90 minutes and then JN and EGW for another 90 minutes to discuss in more detail how JN is to proceed on the three areas we identified (purchasing, HR, website maintenance) including scope of her responsibilities, how those fit into the overall workflow in the office and what training and other preparations (administrative permissions and authorizations) are needed.
I assembled a list of W3school tutorials for JN to go through and a plan of how to proceed from there to address the website maintenance issues, we jointly worked out who JN should contact when regarding the HR and purchasing areas.
Administrative:(catching up on posting)
January 2009: Made hotel arrangements for Lansdowne Speaker (Dr.S.T, April 1-4/09)
Conducting new administrative tasks related to Lansdowne procedures.
Admin.:
Approved changes made to order.
Delivered completed banquet event order (with changes) to LB in HFCS.
TRUTH SYMPOSIUM - Fri., April 3, 09
HHB Rm.128
CATERING: (Friday, April 3, 2009)
Organized menu and all catering arrangements for day's event.
Submitted video recording request
for upcoming HCMC Lansdowne Speaker,
TRUTH SYMPOSIUM, April 3.
Submitted video recording request of upcoming HCMC Lansdowne Speaker
public lecture, April 2.
We all had to go and get medical tests around noon. Took an hour and 15 minutes all told.
MF sent two reports of emails that were rejected. The first appears to be a case where the user submitted an erroneous return email address, and our system eventually gave up trying and reported that failure.
The second appears to be a case of someone spoofing the admin@ and webmaster@ accounts and somehow getting those addresses put on a blacklist somewhere. It seems to be a pretty localized thing, as I have no other problem reports (which I'd expect if suddenly those accounts were universally blacklisted, or suspended by the sys-admins)
Meeting with GN, JN, EG-W, and EF re the handover of the labs to USYS. Issues discussed included the fate of equipment currently used in the labs, but belonging to HCMC (projectors, teacher stations, Squash server etc.), notification processes for clients who may be confused by the change (ensuring that Sanako users don't end up in the big lab, where there's no Sanako system), liaison with Continuing Studies, and booking procedures.
Updated lab request/change
Composed temporary in-house schedule.
A guy turned up from the chair-fixing folks to fix Stew's chair, and then came back later with new arms, which he affixed.
Assisting with /maintaining Lansdowne Speaker incoming paperwork.
Organizing/confirming demos for upcoming Humanities lab sessions
Dealt with some issues arising out of email over the break, including archiving some content dumped from the backup tapes from the old IBM mainframe.
As followup to last meeting, posted a couple of points to the sharespace:
- confirm amount of use of Sanako in lab B and C to see if we can get by with only one Sanako lab in future or not
- provide a few details on numbers and types of furniture in B005, B015 and A012.
- enquire about check-in policy in A012 and possibly in other spaces during peak times
- prepare simple floorplan map for next meeting
Fixed a couple of infelicities (character encoding problem, layout issue), and added the ColDesp project as a featured project (to replace the old one from two years ago). This site really needs a proper rewrite.
Update from Eric F on scope of modifications to accommodate 40-seat language teaching room, smaller teaching room and drop-in facility
Introduce to committee the issue of time and resources dedicated to maintaining legacy projects, and the need for a policy-level decision.
Posting time spent on fire drill.
Confirmed current thinking on preferred use of lab spaces to meet various teaching and drop-in needs (A051, B005, B015, AO12, A015) based on AR's most recent meeting with senior people in Computing
Reviewed proposed governance structure and likely implications for staff responsibilities.
Next meeting to be held Nov 24.
Informed Martin, Greg, Judy.
Spent some time getting us set up to use WebReq, then spent more time learning how to use it. While not without quirks it does seem to work (mind you, we haven't actually received anything yet...).
Quirks:
* We are not listed as HCMC, although there is an HCMC listed; we are still LANG.
* FF3 on OS X was not able to change the "Ship to" code from HCMC to LANG once I had saved the Req. Apparently IE on Windows does not exhibit this behaviour (big surprise there).
* My FF3 is en-GB and WebReq helpfully displayed a pounds sterling symbol instead of a dollar symbol. The actual digits were not adjusted or anything, just the symbol. At first I thought it had made some clever (though unasked-for) adjustment in the background, but no, it's just badly written.
I set up an Amazon.com wishlist for HCMC. If it works, and the shipping isn't horrible, it's a good on-stop-shop for us.
Cleared and cleaned my desk. It took an hour and a half. :-)
Very productive meeting -- details coming on future blog posts from one of us.
Back after a month away, with a pile of email to work through and file, and some other bits and pieces (distributing a couple of payroll advices; figuring out SM's timesheet for the Lansdowne Video work; and so on).
The usual accumulated pile of stuff had to be filed and dealt with. Now up to date.
Soldiered through the gruesome task of filling out the travel expenses form, and ran it over to let the Accounting person check it. All is OK, and it's just waiting for CC's signature; I've left it with EGW for CC to sign when she gets back on Wednesday.
I'm leaving shortly to find out how to fire a fire extinguisher. I shall report back tomorrow.
Went to an interesting workshop on practical techniques for evacuating people from buildings in the event of an emergency. Came away convinced of a couple of things: first, I need to make sure I know exactly where the muster points are for earthquake and fire (they may be different), and second, we need to buy a couple of blankets. Tagging this as a task to remind myself.
Martin, Judy and I helped out with the AP exam today. The instructions from last year were great, but in the heat of moment I forgot that they did not cover the listening only portion of the exam. I'd add something to the instructions that suggests that there is a listening component that comes before the speaking component - just for clarity.
The exam seemed to go well from a technical standpoint; I drove the console while Judy and Martin kept an eye on the student machines for signs of trouble. Martin, Stew and I burned the CDs after the speaking component was done.
Stew, James and I attended a meeting with Colin and Kim to discuss what we can do to ease some of the recovery issues that arose when the disk failed, among other associated things.
We'll be requesting a few new filesystems which will be devoted to the code and data required for a live site as well as one that will be devoted to archival use. Repositories of images, videos etc. that are not called upon in the normal course of events will go in the archive filesystem. This will mean that we can pick and choose which FS gets priority in the event of failure. Obviously, we could have lived without EEBO or the 700GB of TIF files when recovering the data last week. If that stuff had been on a separate FS it would have been faster/easier to restore sites.
Weekly review meeting with Elizabeth:
- no big news on physical space changes to come
- various issues around maintain blog on Digital Humanities of general interest to academic staff
- update on what RD staff have spent their time on this week - only unforeseen major expenditure has been me working on events page for dean's site
Committee met and discussed
- features in other centres researched which we might implement here, and what implications doing so would have on the AcDir position;
- degree to which HCMC should be a Humanities-only vs providing services/co-sponsored by other major units on campus
- degree to which managerial tasks increase disproportionately as complexity of mandate and specifically complexity of funding and administrative structure increases, and how that is to be handled within the HCMC in the future.
In advance, I spent an hour reading through the research reports prepared on the half dozen other centres.
Time spent on timesheet for ShM, figuring out how to pay SnM, etc.
Spent most of the day at the VIHET conference.
Just a catch-all post to log time spent on the following:
- Tending the conversion of Indonesian audio files, which has been running since Monday
- Discussions and research regarding the future of the labs, features and functionality of Study 1200, etc.
- Admin for Lansdowne video project (liaising with the library, working with Sheryl etc.)
Processing HCMC's new courier account
Updated media data-base with new Russian 100 teaching media (textbooks, manuals)
Setting up courier service for HCMC
Continuation of Archive Project:
- ESL: sort materials in readiness for sending to ESL Dept.
- ESL Documentation:In progress.
- Various administrative tasks related to dept. access for new staff.
- Setup/Received online ordering of office supplies
Attended a meeting about the TAPoR 2 grant application.
Went through the accumulated email from the vacation, completing any tasks that were waiting.
A few admin tasks today -- backups, back-and-forth with GRS about their new site, etc.
Went to the CNUG meeting to hear Mark Roman's presentation on the future of CASS.
I'll add tasks arising out of this over the next few days.
JN: Completed and submitted lab usage report to administration.
Oct. 29/07:
JN: Completed audio cassette work order for Neuropsychology Dept.
(23 tapes)
Went to the monthly WebDev meeting and learned about JQuery being used on the new UVic sites, and about the Alumni site plans.
Surplus Equipment:
Confirmation: surplus equipment removed Oct. 4/07
In progress:
Sorting/Removal of additional surplus/outdated equipment
Accounting tasks:
Processed- HCMC invoice/payment/deposit
- cheque requisition
Removed out-dated audio/video equipment; updated inventory data-base and processed surplus equipment paperwork.
Pick-up of equipment arranged.
Stew's absent today, so I'm covering for him to do a presentation to new faculty about our work and related services available to them. Got his notes from him computer, then created a little Web page which will also do as a handout, and printed out some copies. This all hampered by the long server and network outage this morning.
Went through the list of outstanding tasks assigned to me on the blog, and marked as completed many which have actually been done, as well as some others that have gone obsolete for various reasons. Nine remain, mostly minor.
HCMC OPERATIONAL ADMINISTRATIVE TASKS; SUPPLIES ORDERED.
OUTDATED AUDIO/VIDEO EQUIPMENT PROJECT READDRESSED.
REMOVAL OF OUTGOING EQUIPMENT TBA.
ARCHIVE PROJECT READDRESSED.
SORTING STORED COURSE MATERIALS UNDERWAY.
CONTACTED CONTINUING STUDIES REGARDING STATUS
OF ESL TEACHING MATERIALS. AWAITING REPLY.
TRANSPORTATION OF MATERIALS WILL BE ARRANGED ONCE STATUS OF MATERIALS IS DETERMINED.