This from R. Michaels:
Sorry it took a while to figure this out, but I think I have an answer now.
I tried the Benefits Office, but they sent me to Payroll. The end result of a few fairly circular conversations is that:
1. Nobody tracks long service vacation for the PEA - members and their managers do this by themselves.
2. If there are long-term service days owing and there is a form from accounting, I think it's ok to put that on the form, but post-dated to the date of the anniversary of hire (if the form lets you do that?)
3. As for the date that it accrues - Benefits and Payroll seem to agree that it's the anniversary of the date of hire. This is a bit confusing as regular vacation days are renewed on January 1. I suppose you just submit the extra vacation days on the anniversary of the date of hire and add them to your local record of that employee's vacation days.
===========
So on the form we submitted, Martin and I put down 0 long-service days owing as of Feb 1 (as our date of appointment was after Feb 1), but included a note saying we would each earn 10 days this calendar year. If we have to fill in a form next year, we'll include the 10 days.
Project team met for an hour to go over feedback on Service Definition collected from members. DW handed out a document of three use cases and asked us to provide feedback on those. My feedback:
Probably the biggest headache we have maintaining websites is with people that edit styled text in MSWord, copy it to clipboard and then paste (using standard paste) into a WYSIWYG editor (fckEditor embedded in the page or Contribute). The result typically doesn't validate, dumps 100k of ms-specific comments into the page and is extremely brittle to any further modifications. I don't suppose there's some way in the CMS on the paste event to check if the clipboard contains MSWord content and if so to invoke the "paste from word" method. I'd say this issue counts for more problems with shared website maintenance than everything else combined. More generally, what controls are provided to allow the page editor to style text or blocks arbitrarily (i.e. in-line style attributes) vs a list of classes provided to them, and who (site manager?) can add or modify the list of classes?
1.2
"lets web services know that new secondary navigation should be created". So the user can't modify the secondary navigation themselves? or the system isn't smart enough to derive the nav scheme from path and file names? Some users will find that annoying, others will be OK if turnaround is very fast (i.e. same day). We maintain some sites where when the user wants a new page we create the page and modify the nav and then they add the content. That seems less weird to them than creating a page that is orphaned temporarily or writing links to a page that doesn't yet exist. Would web services provide that "make an empty page and modify navigation" service?
1.3, 1.4
Details on configuration of dynamic components will need lots of documentation, examples or help. Inevitably styling will be an issue, so components need to be identifiable using css selectors
Case 2
Can the site manager role limit which files or folders each editor can write to?
2.1
On grabbing and processing stuff in general: what's the likely degree of support for php or for AJAX? (i.e. a library of code on the site that can be called by pages on the site to process raw feeds from a source or db into something usable on the site)
2.2
Site manager role: This person can modify the navigation (i.e. replace 'web services' in 1.2 above), right?
If you've got a "staging server" (i.e. the equivalent of www-dev), presumably there's also a "public server" (i.e. the equivalent of www) and a "publish to live site" button to move content from one to the other. (Is granularity file level, folder level or site level?).
Do you also need the ability to "go live later in the week"?, rather than have manager click the publish button and it takes effect immediately?
Case 3
Not much to say about Dave and his duties. We've found that blogging queries and solutions results in a resource that we and users can access later when similar (or the same) question comes up again.
By the way, the current templates could probably use some work to make them amenable to a CMS. For example, the current templates assumes that all files for a site sit in the root folder and that all the navigation is hardcoded on each page. We've modified those so that each major section gets its own folder and each page is a file in that folder. The index.htm file in the root is just a redirect to the home/index.htm file. Also, we've centralized navigation by using php variables to track which section and page is current and then use those to set values for the class attribute of elements in one navigation file shared by the whole site.
Logging time -- most of my day today is taken up with doing a campus tour with the candidate, lunch, and then the interview.
Went to the presentation by the first of our three candidates, and spent some time discussing it with colleagues afterwards.
Did some work preparing for candidate visits to UVic starting next week.
Posting time I'll be spending at a search committee meeting this afternoon.
Logging time spent preparing for this afternoon's meeting.
Posting time spent preparing for the search committee meeting tomorrow.
Had a couple of conversations with Greg, and meeting with RS. The home1t file-system is reaching its capacity of 4 TB (can only be expanded by outlay of $6000 to $8000 for more drives). To facilitate maintenance and ease of recovery, we want to get that down to less than 2 TB.
ETCL occupies about 3/4 of that and grows faster than all other projects combined. So we plan to move the ETCL tree to its own filesystem. We've recently been working to create a 4 TB filesystem for INKE. That project has little data now but will have more coming. Considered putting ETCL and INKE into one filesystem, which could be expanded later fairly painlessly (sys-admins approving). RS prefers to have two separate filesystems, and not have to worry about expanding either for a long time. Getting an addition filesystem will require the RS request it. I sent an email summarizing situation which RS may wish to use in support of any such request.
Logging the time I'll be at this afternoon's search committee meeting.
Posting time spent on preparation for this afternoon's meeting.
Posting time spent dealing with email on the first day back, and doing routine maintenance, backups, uploads etc. that have accumulated over the vacation.
Committee met. My action items:
- get estimate of annual cost of equipment purchase and maintenance, and items needed by end of this fiscal year to RS (started on that - talking with Greg)
- create online form for major project applicants, to include sections in that form for items (computers, peripherals) and services (supervision, training, project management) provided by HCMC that can be included in the budget (will start on that this week)
- invite Systems to report on use of A012 and A051 since change in service status (did that immediately following meeting)
Judy and I reviewed the HCMC books for the month of November. In addition to the usual charges, there were some charges to do with the renovation, all of which seemed reasonable.
One item I had to follow-up on. We traded in a 24-port switch for a 48-port switch and should have been charged the difference between the two values (about $2500), but were mistakenly charged the sum instead (about $10000). Contacted purchasing, who confirmed their error and promised to correct it.
Items outstanding to keep an eye on:
- we've bought a server for $6000 and are awaiting reimbursement from Dalhousie
- we've got a $1000 expense on our account that the library (MF) has agreed to accept as part of our disentanglement
- we can expect a $300 transfer out as our contribution to costs of the VicVic website launch
Logging time spent on search committee work.
Three down, three to go.
Logging time spent.
Logging time spent on work for the D. search committee.
Judy and I have been looking for a formal statement of the HCMC mandate, focusing on the time that our office's mandate expanded from Languages to all of Humanities Computing.
This appears in a document entitled Duties of the Academic Director dated 20 November 2000 :
"The Director is responsible for upholding the Centre's mandate to foster academic excellence through effective and innovative applications of technology in language teaching and humanities computing."
In a HCMC Advisory Committee document of about the same time entitled "Future Computing Needs in the Faculty of Humanities" the following are some of the identified areas of responsibility:
- programming
- an academic computing commons
- digitization of data resources
- website creation and maintenance, especially course materials
- collaboration on grants and applications
- support for projects once grant funding expires
- storage to support research and courses
- specialized servers (SQL, PHP, PERL, etc.)
Met with RS, MC and Greg to talk about technology for INKE
Area 1: corpus, management interface, analytic software
Area 2: CMS-driven website and related services for each of four aspects of project, including subversion repository
Area 3: dotproject for administration
Attended meeting of DH committee:
- election of Ray S as chair of committee
- discussion of the kind of issues the committee will consider (approval of major research projects, review of allocation of resources, oversight of HUMA series of courses, balance of resources dedicated to language teaching, literary/text analysis, administrative/dept website support)
- review of documents HCMC provided on what HCMC does and procedure used to decide allocation of people and space
I modified some wording to the documents based on suggestions from members of committee and am to meet with Ray this week to organize issues for the next meeting.
Met with RS and MC of ETCL to talk about server technologies they're requesting:
- webserver with php
- subversion repository
- .project implementation for planning
Will discuss with Greg and get back to them
Also talked about notes regarding future of ETCL drawn up by RS for submission to DH committee and possible implications (if any) for HCMC. Talked about strengths and weaknesses of each units administrative structure and how those could continue to be complimentary in the future. He'll submit his notes to the committee for consideration, I agreed that considering ETCL made sense when looking at role of HCMC in future, but made no commitments beyond that.
She'll be working with KSW Monday afternoons and Tuesdays.
Posting time spent interviewing potential workstudy candidates, and time going on a committee meeting this afternoon.
Talked with everyone on staff and wrote update of what we've been doing and submitted it to the associate dean. Following is the summary and issues to be addressed, the report also includes details on incoming requests, completed projects and our current work.
We've completed two major and two minor projects. We've received two
major project proposal requests. Our software developers are fully
committed until end of Dec. 2009 on projects and ongoing work details
below. I estimate that if both proposals we've received are accepted,
developer time for major projects will be committed until August 2010 at least.
We document all our activities at http://hcmc.uvic.ca/blogs
The renovation is almost complete and the bookable computers are operational. We have drafted policy and terms for use of the bookable computers which we attached to the update. We have implemented a booking system and are accepting requests. The schedule for bookable computers is at http://hcmc.uvic.ca/schedule
The HCMC has always been entitled to invite one Lansdowne scholar per
year. Is that still the case? If so, who to invite at our next
opportunity? If not, what happens to that money?
The Academic Director of HCMC has always been entitled to sit at the
committee of department chairs. How should that function be fulfilled now?
The HCMC is now responsible for approximately 20 computers (servers, staff workstations, bookable workstations) of varying ages (an increase of about 8). The useful lifespan of any one of them is about 4 years, so we'll need money for approximately 2 computers per year in addition to what we're spending now.
Still in the testing phase, but MRBS looks solid enough -- entered all the current bookings for Arugula, Chicory and Dandelion.
went over key situation with Judy: rekey B046, reverse and rekey deadbolt into B045 from CALL.
update from Greg on 1-gig switch and email to Pat T to get update on installation
update on floor and sealing from Greg and Jacob
confirm transfer of $1000 from USYS for projector has been initiated
update from Greg on computer in lieu of Lab B teacher station - turns out to be not suitable, returning it to MT
- tested the outlets, found two duplexes not working reported that to RC
- set up meeting next week with KF of FacMan to finalize furniture plans
- dean AR dropped by to check on progess, updated him and confirmed details of account used to pay for project
- enquiries from history and english profs on when space would be available, told them we need the floor sealed and base molding installed and a new switch installed in the network closet. Floor should be done within next couple of days, not sure about installation of switch.
Just logging time spent in meetings with GN, DL and RC over the next phases of the renos. The tentative plan is now to move the whiteboard, possibly buy some 3-foot-high bookcases if we can afford it, and re-use our existing benches and chairs according to the plan GN has been updating. We now have costs for the bookcases from DL.
Today we (GN, JN and MDH) had two sessions working on a document for Stewart to present to the first meeting of the HCMC committee, outlining our purposes and procedures. Brainstorming on the whiteboard proved more successful than collaborative editing of a document, and JN has typed up the results to be sent to Stew. Details probably shouldn't be posted online, since this is provisional.
SA goes on vacation after today, so this falls to me. This is where we seem to be at:
Before the demolition crew can remove the wall, 3 things need to happen:
- Dawn needs to walk through the space with me, and discuss where the 14+ network ports and power outlets in the wall are going to end up after the job is done
- Cable people need to come and disconnect those outlets, and pull the cables out of the way.
- Furniture and equipment needs to be moved back at least 4 feet from the wall on both sides.
SA has written to MB with regard to moving the ISE's workstations; they can presumably go to the ISE's other office space. He's also written to the History project folks about getting all their stuff out. JN and I will move all our stuff starting on Monday, some into the old coordinator's office, and some (desks/tables) into stacks far enough back from the walls; any remaining stuff from the History project can be piled up on the far side of that room.
Went over items in email I sent to SB last Friday.
My action items:
- contact HR regarding continuation of benefits if I take leave
- contact dean's office regarding granting of leave request if I take leave
- report back to Martin, Greg, Judy on staffing arrangements if I take leave (Martin takes on committee and managerial tasks, we organize projects so that a bundle of them can be completed by a contract programmer)
- prepare a draft policy on use of shared research resources to bring to committee for approval/modification to take effect once renovation is complete
- proceed with overseeing stage 2 of renovation
After the meeting went over points with Judy and Martin.
Over 500 emails to get through. Managed it by about 5.15. Also had some discussions with JN and SA about his vacation, and other long-term planning issues.
Met with CP from library. He wanted to know if we'd received a transfer of $10,000 from JL in History in connection with the Archival Community Digitization Program (ACDP). They'd since considered it would be better for the money to be transferred to an account under the control of the library and not HCMC. I showed him transfers from the library to HCMC of $10,000 and of $5,000 and he said those were as they should be, but not the transfers in question. It appears that the ACDP money has not been transferred from JL to HCMC. CP thought that was good. He said he would contact JL and get him to transfer the money to a library account.
Also finalized CP's travel expense claim (drawn from the $15000 mentioned above), signed it and submitted it to accounting.
In anticipation of the Facilities Management furniture person arriving at some point, I scrounged up old sketches and reviewed Greg's more detailed sketch he did Friday for furniture placement in new unified space. The issues are:
- B045 to accommodate about 10 workstations, a meeting table, whiteboard; and possibly move screen and projector from B043
- B043 to accommodate space for administrative manager (Judy), three programmer consultants (Greg, Martin, Stewart), one media station and casual meeting/reading area for three or four
- possible problem with double door to CALL space
- limited wall space to house services in center of space and along walkway
- separation and isolation of walkway space and working space at top end of B045
- use wide walkway space to accommodate storage along one or both sides : replace wooden storage box with metal file folders from B046
Based on all that, I did another drawing based on Greg's. Will circulate drawings to Judy, Greg and Martin to get feedback before talking to Facilities Management person.
Met RS, ES, SB to
1) confirm everything OK with the access terms I'd circulated earlier.
2) update with information from Facilities Management on renovation: space in wall between b045a and B043 beginning Wednesday July 22, rest of work start likely in late September
3) discuss terms of use once renovation complete and procedure faculty members use to apply for space and communication of requests and use of space between HCMC and committee
I requested Facilities Management to change the locks into B045a, which they did a little more quickly than I anticipated. In any event, this brought to light differences of understanding amongst me, Eric Sager, Ray and the dean on terms of use for that space at the moment and scheduling of modifications to that room for ultimate inclusion in HCMC's operations.
A number of emails and phone calls amongst affected people and eventually a meeting on Friday July 3 with Sikata, Andrew, Melanie (for Ray) and me to hammer things out.
As a result of that meeting: I proposed terms for access until the renovation started, which Ray and Eric agreed to.
I met once with Randy Carter (Facilities Management) to discuss options.
I developed and proposed a two-stage renovation plan which Andrew agreed to, have contacted Randy again to proceed with planning and implementation.
Ray, Eric, Sikata and I will meet on Monday to update each other.
Had enquiry from Associate Dean of Social Sciences about getting an instance of the Agenda timetable software (php/mysql) for their use. They also need some modifications: able to output a fall-only, spring-only as well as current fall+spring timetable (required); include employee number field for instructors (required); clone an entire timetable for one term to another (optional); a meta=timetable that allows dean's office to see if there are bottlenecks across departments (optional).
Told them HCMC can't do that work, but we could make a copy of the software available to them and they could hire a programmer to make the necessary adjustments. Recommended Clifton to them and they got me to set up a meeting with Clifton, me and them to formalize scope of project. That meeting was today. Clifton will now estimate time and cost to do the necessary work.
The locks were changed on the door to the bunker, and the history people are moving things (and people) in and out. Talked with Greg, who was talking with Eric and Peter. Sent an email on HCMC plans for preparing that space for inclusion under our administrative orbit:
- incorporate space into our booking system as of September
- disable card reader on door, so that all access to room is through our front office
- prior to September, arrange furniture and equipment we have as needed
- in fall, make plans for equipment, network, use of space, etc. to take effect after renovation of space is completed
Had Judy and Greg review draft as they're directly affected, chatted with Ray as he happened to walk by, sent email to Eric Sager, Peter Baskerville and Andrew Rippin (as any renovation is under his authority)
With Greg and Martin, wrote up three job descriptions for WorkStudy positions:
Junior Programmer, Junior Developer, Historical Mapping Assistant
To keep in mind:
- job postings are active for only 8 weeks and then positions are cancelled
- we can elect to have our department's hours allocated equally between jobs or in order of ranking
- we can top-up the wages with money from our own accounts.
We anticipate 400 to 500 hours, so will review how we want to allocate those hours and then submit the applications.
Met with EGW to discuss administrative details once she is no longer Academic Director.
Money-related requests (signing authority, credit card, FAST/EASY access to dept and special projects accounts) go through AS in the Dean's office.
Decided to top up the wages paid to any WorkStudy students we hire next year.
Sat on the interview board for a couple of ETCL interviews, since Stewart's away.
To put a vacation message on your account:
- log in through mail.uvic.ca
- click on options
- click on Out of Office Assistant
- fill in form
- click Save button at top of Out of Office Assistant
To forward a message to another account:
- you have use IE7 or newer
- log in through mail.uvic.ca
- click on options
- click on Rules
- click on New Rule
- click on Create New Rule for Arriving Messages
- click on Forward or Redirect
- check Forward the message to people ... checkbox
- click on the "people or distribution lists" link
- enter the email address you want to use in the To -> field
- click OK
- give the rule a name
- click Save
Met with AR, two history profs (PB, ES), Greg and Elizabeth in B045a (the "bunker") regarding future of B045a and adjacent HCMC space (B045, B043). Current thinking is to re-integrate that space into HCMC's sphere as a shared research space by removing walls. History profs mentioned specific stats projects they'd like accommodated. Also discussed degree to which that space should be used by students for course-work (as little as possible), and for recording or video-conferencing (none).
AR asked me to submit to him a proposal by end of day describing 1) what work to the space would be necessary to minimally reintegrate the space with current HCMC space; and 2) what work would be necessary to optimally reintegrate the spaces currently occupied by B045a B045 (ISE and audio) and B043 (current HCMC space). Discussed with Greg, Judy, Martin, prepared report with a couple of sketches and comments on pros and cons of each modification and submitted to AR.
Posting two hours as something like the amount of time it's taken to administer workstudy this semester (form-filling, chasing up missing cheques, hand-delivering late forms when signer showed up too late for the mail, etc.). This is just for tracking purposes.